If you own a single-family residential lot in Los Angeles or Orange County and want to add usable space or rental income, building an Accessory Dwelling Unit (ADU) is one of the fastest ways to do it.
An ADU isn’t defined by how it’s built but by its purpose as a secondary housing unit on a residential lot. Whether it’s a brand-new detached backyard unit, a garage conversion, or an attached addition, it all falls under the same category — and RD Fast Construction builds all three.
An ADU project touches nearly every trade: design, permitting, foundation, framing, plumbing, electrical, HVAC, and finishes. At RD Fast Construction, our team manages the entire process in-house, from the first sketch to the final inspection, so you don’t have to coordinate multiple contractors yourself.
With that in mind, trust RD Fast Construction for your next ADU project in Los Angeles or Orange County — detached, converted, or attached.